Development of an energy storage facility designed to provide 100mw of system support services to the electricity grid at Cloniffeen, Shannonbridge, co. Offaly. Development will consist of ; i) a single storey metal clad building (floor area 4,500 sqm) to a height of 7.1m, which will include: reception area, offices, battery room, workshop area, welfare facilities and ancillary service rooms, ii) perimeter secured switchyard containing mv switchgear room (floor area 100 sqm) to a height of 4m and main transformer which will electrically connect to the existing 220kv Shannonbridge substation located on lands adjoining the site to the west, iii) all ancillary development, including perimeter fencing and landscaping, security hut at site entrance, car-parking, access roads, all civil engineering works for the disposal of foul and surface water, lighting and site entrance with connection to a local road which provides access to the r357.

To find out more details on this Power Generation Development in Offaly Granted permission on 2017-12-05 take the free trial here.


Address:
Cloniffeen

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL