10 April 2024
“Belclare” Development will consist of: 1. Partial demolition of existing front wall to create new vehicular access to the site from Newtownpark Avenue. 2. New driveway to access proposed new properties. 3. Construction of 4 no. detached dwelling houses, flat roof four bedroom units. 4. Eight on curtilage car parking spaces(2 each) and private amenity open space to each new dwelling. 5. Existing vehicular entrance gateway (a Protected Structure) to remain as the vehicular entrance to the existing house Belclare. 7. New landscaping, tree planting and boundary treatments. 8. SuDS surface water drainage, foul water potable water connections. 9. All ancillary works necessary to facilitate the development.
Permission for development. The development will consist of: 1. Partial demolition of existing front wall to create new vehicular access to the site from Newtownpark Avenue. 2. New driveway to access proposed new properties. 3. Construction of 4 no. detached dwelling houses, flat roof four bedroom units. 4. Eight on curtilage car parking spaces(2 each) and private amenity open space to each new dwelling. 5. Existing vehicular entrance gateway (a Protected Structure) to remain as the vehicular entrance to the existing house Belclare. 7. New landscaping, tree planting and boundary treatments. 8. SuDS surface water drainage, foul water portable water connections. 9. All ancillary works necessary to facilitate the development.
To find out more details on this Residential Development in Dublin Started on 10th April 2024 take the free trial here.