08 March 2024
The development consists of 11 No. units-5no. apartments through demolition works + rebuilding/ extensive renovation of existing building with 6 No. proposed dwellings comprised within terrace and semi- detached buildings to the rear of the site.
For the demolition of existing 2-storey dwelling to Patrick Street adjoining out-buildings and existing barn to the rear thereof, in addition undertake alterations and refurbishment of existing Red Barn Building to Patrick Street, to include minor works to fenestration and front façade within the curtilage of a protected structure RPS No. C12 & NIAH Ref No. 12303011, to accommodate 6 no. Apartments within the existing building envelope and adjoining rear yard area and also to undertake the construction of 6 No. Apartment units to the rear of the site (a total construction of 12 No. Apartment units to the entire development) The works are to include all associated site works, ancillary accommodation, drainage, road works and traffic control systems. The development entrance will be via the current site entrance to Patrick Street.
Tender:
5 nr. Apartments to be constructed within the existing building envelope along with the construction of 6 nr. single storey units to the rear of the site (a total construction of 11 nr. units to the entire development) The works are to include all associated site works, ancillary accommodation, drainage, road works and traffic control systems
To find out more details on this Residential Development in Kilkenny Started on 8th March 2024 take the free trial here.