15 January 2024
Griffin Point Apartments Development (HITW) consisting of the construction of Apartment Blocks A & B (212 apts) and C & D (210 apts): To see the construction of 422 no. apartments including basements & associated site works along with associated landscaping, parking, and site development works.
2 Dec 2022
Phase 01 Griffin Point Apartments (HITW) Blocks C & D. Construction of 210 no. apartments including basement & associated site works.
We, Belwall Limited intend to apply to An Bord Pleanála for planning permission for a proposed Strategic Housing Development on lands at Saint Columban’s, The Hole in the Wall Road and the R139 Road, Donaghmede, Dublin 13 and No. 25 The Hole in the Wall Road Donaghmede, Dublin 13. The proposed development will consist of a residential development comprising 413 no. apartments (65 no. studios; 140 no. 1 bedroom units and 208 no. 2-bedroom units) across 4 no. apartment blocks (Blocks A-D) ranging from 5 storeys to 7 storeys in height with balconies/terraces to all elevations. The apartment blocks consist of the following:
Block A – 5 & 7 storey apartment block comprising 98 no. units as follows: 1 no. studio; 28 no. 1 bedroom units and 69 no. 2 bedroom units.
Block B – 5 & 6 storey apartment block comprising 90 no. units as follows: 15 no. studios; 26 no. 1 bedroom units and 49 no. 2 bedroom units.
Block C – 5 & 6 storey apartment block comprising 116 no. units as follows: 25 no. studio units; 48 no. 1 bedroom units and 43 no. 2 bedroom units.
Block D – 5 & 7 storey apartment block comprising 109 no. units as follows: 24 no. studio units; 38 no. 1 bedroom units; and 47 no. 2 bedroom units.
The proposed development will also comprise residential amenity facilities and concierge/management suites in Blocks A and C; 1 no. childcare facility at ground level of Block A; a total of 298 no. car parking spaces (39 no. spaces at surface level (including 3 no. creche drop-off spaces and 1 no. creche staff parking space), 105 no. spaces at lower ground level below podium level communal open space courtyards (level 00) and 154 no. spaces at lower ground level below podium level communal open space courtyards (level B1); 8 no. motorcycle spaces; 788 no. bicycle parking spaces (including 10 no. spaces within the childcare facility and 20 no. spaces for car bicycles); landscaping, including communal open space and public open space and children’s play spaces; boundary treatment; 3 no. ESB substations at ground level with associated switch rooms; plant and waste storage areas, water tanks; solar/pv panels to roof levels; 1 no. new vehicular and pedestrian entrance and 1 no. new pedestrian/cyclist access to The Hole in the Wall Road to the east; 2 no. new pedestrian/cyclist accesses and emergency vehicle access/egress onto the R139 to the south and all associated engineering, infrastructural and site development works necessary to facilitate the development, including the demolition of the existing 2-storey dwelling at No. 25 Hole in the Wall Road and the 2-storey Saint Columban’s building and all associated outbuildings and structures.
To find out more details on this Residential Development in Dublin Started on 2nd December 2022 take the free trial here.