24 Jan 2024 Phase 2D: Construction of 46 houses at Fortunestown Lane
8 Nov 2022 The proposed development consists of a three storey building is a mix of apartments and duplex units (Apartment Block D). – Parklands, Dublin 24
06 Jul 2022 Phase 2C: Construction of 82 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
27 Jun 2022 Construction of 2no. residential units in Phase 1A, Block A, Parklands, part of the housing development at Fortunestown Lane and Garter Lane, Saggart, Co. Dublin.
07 Dec 2021Phase 2B: Construction of 101 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
09 Jun 2021 Phase 2A: Construction of 49 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
03 Nov 2020 It is proposed to build a new bin store known as Block A, bin store 1 within the Parklands Residential Project. The bin store will be constructed on site, adjacent to Block A. It is proposed to build a new bin store known as Block B, bin store 1 within the Parklands Residential Project. The bin store will be constructed on site, adjacent to Block B.
28 Jul 2020 Construction of 6no. residential units within Phase 1A, Blocks A and B, Parklands, Dublin 24. Specifically numbered 1-4 Parklands Place and 2 and 4 Parklands Boulevard.
23 Jun 2020 Construction of Block B consisting of apartments and duplex units – Parklands, Dublin 24 & Block A consisting of apartments and duplex units – Parklands, Dublin 24.
09 Mar 2020 Phase 1B 91 houses at Fortunestown Lane and Garter Lane residential development, Saggart, Co. Dublin
02 Jan 2019 Phase 1A for 95 houses at Fortunestown Lane and Garter Lane residential development with associated siteworks in Saggart, Co. Dublin.
A residential development comprising: 526 residential units and all associated site and development works as follows: – 274 3-bed 2 storey terraced units, 185 4-bed 2 and 3 storey terraced and end of terrace units, 67 2-bed apartment/duplex units (37 2-storey, 2 bed terraced duplexes, 18 1-storey 2 bed terraced apartments and 12 1 storey 2 bed end of terrace apartments). The development also provides for a district park (4.58 ha) and a neighbourhood park (0.71 ha) in accordance with the Fortunestown Local Area Plan 2012. Permission is also sought for 789 car parking spaces, bin storage areas, ESB substations and all associated site development and infrastructural works. Vehicular access to serve the proposed development will be provided via two new access points off Garter Lane and via a new signalised junction at the southeastern corner of the site to replace the existing roundabout off Fortunestown Lane. Provision is made for a future access to Bianconi Avenue. In addition, an interim local square is proposed within the subject site providing a direct pedestrian link from the proposed development to the Saggart Luas stop. Two direct pedestrian links are proposed between the subject site and the adjoining school sites permitted under Reg Ref No SD16A/0255 providing a direct link between the school and the proposed district park and a direct link from the west of the school site to the proposed residential development. Lands identified for future development are located along the southern boundary of the current application site adjacent to Fortunestown Lane/Saggart Luas Stop. These areas will be subject of a future planning application (Phase 2) and will include the final design and layout of the local square.
To find out more details on this Residential Development in Dublin Started on 2nd January 2019 take the free trial here.