The development will consist of:
(1) Demolition of existing unfinished terrace block structures on site (2) Construction of a housing development with a total of 52 no. dwellings in detached, semi-detached and terrace configurations, consisting of 20 no. 5-bed detached houses, 6 no. 4-bed semi-detached houses, 4 no. 3-bed semi-detached houses, 10 no. 3-bed terrace houses, 11 no. 2-bed terrace houses and 1 no. 2 bed detached single storey house.
(3) Associated development and works including the extension of existing pedestrian and vehicular access to Lansyn Bohernasup, all hard and soft landscaping, internal roads and footpaths, cycle and car parking, public and private amenities and open spaces, boundary treatments, public lighting, and all other ancillary works above and below ground including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.
To find out more details on this Residential Development in Mayo Granted permission on 19th June 2025 take the free trial here.

