The development will consist of:
(1) Demolition of existing unfinished terrace block structures on site (2) Construction of a housing development with a total of 52 no. dwellings in detached, semi-detached and terrace configurations, consisting of 20 no. 5-bed detached houses, 6 no. 4-bed semi-detached houses, 4 no. 3-bed semi-detached houses, 10 no. 3-bed terrace houses, 11 no. 2-bed terrace houses and 1 no. 2 bed detached single storey house.
(3) Associated development and works including the extension of existing pedestrian and vehicular access to Lansyn Bohernasup, all hard and soft landscaping, internal roads and footpaths, cycle and car parking, public and private amenities and open spaces, boundary treatments, public lighting, and all other ancillary works above and below ground including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.

To find out more details on this Residential Development in Mayo Granted permission on 19th June 2025 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Mayo


Address:
Bohernasup

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL