Permission for development at a site at Ballycannon, Kerrypike, Cork. The proposed development will consist of the demolition of an existing boundary wall and gated access, and 2 no. existing animal shelters; the construction of a 2-storey commercial building including signage, with ground floor pharmacy and 1 no. medical consulting room, and 4 no. medical consulting rooms and ancillary services at first floor; 31 no. residential housing units to include: 3 no., 4 -bed detached dwellings, 8 no. 4-bed semi-detached dwellings, 16 no. 3-bed semi-detached/end of terrace dwellings, 2 no. 3-bed end of terrace dwellings, and 2 no. 2-bed mid-terrace dwellings; car parking; 1 no. new access; new footpath along the public road; public lighting; provision of a new boundary wall with fence, 1 no. new gated access and 1 no. relocated gated access to an existing dwelling; 1 no. new internal access with entrance pillars to an existing dwelling; and all associated site development, drainage and landscaping works.

To find out more details on this Residential Development in Cork Started on 27th September 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Mixed Development New Build in Cork


Address:
Ballycannon

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL