A – Residential development of 37 no. two-storey detached dwelling houses to complete the existing partially complete ‘Kilnamanagh Manor’ residential development
B – Demolition and removal of various existing partially constructed dwelling structures, concrete bases etc on the site
C – Decommissioning of the existing non-operational foul treatment plant, reed bed and pumping station
D – Construction of a new foul water pumping chamber and foul water rising main
E – Connection of the existing foul water network, serving existing dwellings 01-13 Kilnamanagh Manor, to the new foul network
F – Surface water attenuation tank and outfall to stream
G – Removal of the existing temporary access, currently used by residents of No’s 10 to 13 Kilnamanagh Manor, and for the provision of a new site entrance along with site landscaping, boundary treatments and all necessary and ancillary site works to complete the development.

To find out more details on this Residential Development in Tipperary Applied for on 11th September 2025 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Tipperary


Address:
Dundrum

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL