14 Oct 2024
Construction of 176 No. dwelling houses consisting of 5 No. Detached, 122 No. Semi-Detached; 49 No. Terraced houses at Kilwoghan Woods, Celbridge, County Kildare.

16 Apr 2024
Phase 9: Block 8; 4no. units 79-82 The Drive, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 8: Block 7; 4no. units 6-9 The Avenue, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 7: Block 6; 4no. units 2-5 The Avenue, Kilwoghan Woods, Celbridge, Co. Kildare

20 Apr 2024
Phase 6: Block 5; 4no. units 65-68 The Drive, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 5: Block 4; 2no. units 64 The Drive and 1 The Avenue, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 4: Block 3; 4no. units 59-62 The Drive, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 3: Block 2; 2no. units; 56 The Drive and 1 The Walk, Kilwoghan Woods, Celbridge, Co. Kildare.

16 Apr 2024
Phase 2: Block 1; 4no. units 51-54, The Drive, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 12: Block 11; 16no. units 17-24 & 91-98 The Avenue, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 11: Block 10; 4no. units 3,5,7,9 The Green, Kilwoghan Woods, Celbridge, Co. Kildare

16 Apr 2024
Phase 10: Block 9; 4no. units 83-86 The Drive, Kilwoghan Woods, Celbridge, Co. Kildare

20 Apr 2024
Phase 1: Construction of 176no. dwellings consisting of 5no. Detached; 122no. Semi Detached; 49no.Terraced at Kilwoghan Woods, Celbridge, County Kildare.

Strategic Housing Development

The development will consist of a residential development consisting of 467 no. dwelling units (216 apartments, 199 houses and 52 duplexes) along with ancillary childcare facility (776sq.m), gym (320sq.m), café (123sq.m) and retail unit (119sq.m). The residential units consist of the following: 216 no. apartments (184 no. 2 beds, 32 no. 3 beds) contained in 4 no. blocks to the east side of the site (Blocks A, B, C & D), ranging from 5 to 6 storeys high (the top floor of each apartment block contains a set back). Blocks A, B & C have basement car parking.

251 no. houses and duplexes as follows: 20 no. 5 Bed semi-detached 3 storey houses, 69 no. 4 Bed semi-detached 2.5 storey houses, 23 no. 4 Bed terraced 3 storey houses, 38 no. 3 Bed semi-detached 2 storey houses, 49 no. 3 Bed terraced 2 storey houses, 18 no. 1 Bed apartment units within 2.5 storey duplex blocks, 26 no. 2 Bed apartment units within 2.5 storey duplex blocks, 8 no. 3 Bed apartment units within 2.5 storey duplex blocks. The proposed ancillary childcare facility, gym, café and retail unit will all be located on the ground floor of apartment block D.The proposed development includes the provision of a landscaped 2.068 ha. public park to the north.

All associated site and infrastructural works, including open space, landscaping, boundary treatment, roads, paths, cycle paths, car and cycle parking (including basement parking under the apartment blocks), foul and surface water drainage, 2 no. substations, 2 no. sub units, and 2 no. vehicular entrance/egress points off the Maynooth Road.

The application also involves works on lands in the ownership of Kildare County Council in order to facilitate access to the proposed development off the R405 Maynooth Road. An Environmental Impact Assessment Report has been prepared in respect of the proposed development

To find out more details on this Residential Development in Kildare Started on 20th April 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Kildare


Address:
Kilwhogan Stream

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL