The development will consist of 65 no. residential units comprising of: (a) 2 no. 3 bed single dwelling, (b) 1 no. 2 bed single storey dwelling, (c) 8 no. 4 bed, two storey semi-detached dwelling, (d) 30 no. 3 bed, two storey semi-detached dwellings, (e) 8 no. 3 bed, two storey town houses, (f) 12 no. 2 bed, two storey town houses, (g) 4 no. 4 bed, two storey detached houses. The development also includes the construction of pumping chamber with connection to the existing foul sewer network, connection to mains water, surface water attenuation system, access roads and hammerheads together with landscaping, public amenity space, entrance via existing Turry Meadows housing estate and all associated site works.

To find out more details on this Residential Development in Meath Granted permission on 21st January 2025 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Meath


Address:
Bunboggan

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL