02 Dec 2024 Construction of 51 terraced, semi-detached and detached houses at Bridgegate, Rathgory, Ardee, Co. Louth
05 Aug 2020 Construction of 18 houses at 15-26 Bridgegate Park and 1-6 Bridgegate Avenue, as Phase 5 of the overall Bridgegate housing development.
30 Oct 2019 Construction of 6 houses at 5-10 Bridgegate Park, Ardee, Co. Louth, as Phase 4 of Bridgegate development
23 Sep 2019 Construction commenced of Phase 3 of the proposed residential development
Permission for a residential development on a site area of c.3.70 hectares across 2 no. parcels of land and is located in the townland of Rathgory and Mulladrillen. The proposed development amends and will supersede elements of the development permitted under Reg. Ref. 10/174 (ABP Ref. PL15.238053), which is presently under construction.
The proposed development will consist of the construction of a total of 65 no. residential houses (replacing the previously permitted dwellings at the location), comprising of the following: 18 no. 2 bed terrace two storey dwellings (Type 1); 23 no. 3 bed detached and semi-detached two storey dwellings (Type2); 12 no. 3 bed detached and semi-detached two storey dwellings (Type 3); 4 no. 4 bed semi-detached two storey (Type 4); 2 no. 4 bed detached two storey dwellings (Type 5); 6 no. 3 bed semi-detached two storey dwellings (Type 6).
The proposed development also provides for a community facility extending to 176sqm gross floor area and a crèche building with a gross floor area of 378sqm, which will replace previously granted crèche and commercial units at the location. Vehicular access for the residential units will be provided via the adjoining permitted residential development (Louth County Council Reg. Ref. 10/174, currently under construction).
The total gross floor area of the proposed development equals c. 7,348sqm. The proposal includes all associated site works, internal roads, cycleways and footpaths, the provision of public open space, car parking, landscaping, boundary treatments and foul and surface water drainage.
To find out more details on this Residential Development in Louth Started on 23rd September 2019 take the free trial here.

