26 January 2024
Construction of a new 4 storey apartment block comprising of 20 No. flats together with associated site works at development to be known as Bakerhall

12 Oct 22
Construction of a new 3 story Duplex, comprising of 12 no units, together with associated site works at development to be known as Bakerhall, Limekilnhill, Belmont, Academy Street, Navan, Co. Meath

05 Aug 2022 Construction of 82 No. new 2 and 3 storey dwellings together with associated site works at development to be known as Bakerhall. Construction of three new 3 storey Corner blocks, comprising of 15 no units, together with associated site works at development

13 May 2022 Construction commenced of 8 No. new 2 storey dwellings together with associated site works at development to be known as Bakerhall

06 May 2022 Construction commenced of a new 3 storey Corner block, comprising of 5 no units and a new 3 storey Corner block, comprising of 8 no units,Construction of a new 3 storey Corner block, comprising of 5 no units

14 Jan 2022 Construction of a new 3 storey Corner block, comprising of 8 no units, together with associated site works.

20 Jan 2022 Construction commenced of 103 no new 2 and 3 storey dwellings together with associated site works at development to be known as Bakerhall

01 Dec 2021 Construction commenced of 6 no new 2 storey dwellings together with associated site works at development to be known as Bakerhall

24 Nov 2021 Construction of a new 3 storey Corner block, comprising of 5 no units, together with associated site works at development to be known as Bakerhall, Limekilnhill, Belmont, Academy Street, Navan, Co. Meath

16 Nov 2021 Construction commenced of Phase 1 of 59 no new 2 and 3 storey dwellings together with associated site works at development to be known as Bakerhall

Strategic Housing Development

The development will consist of the construction of a residential development of 544 no. dwellings, 2 no. creches and open space areas as follows:

A) 260 no. houses comprising; 18 no. 2 bedroom houses, 207 no. 3 bedroom houses, 35 no. 4 bedroom houses, – House Type F1, F2 & F3, 3 storeys, House Type N8, N8A & N8B – include detached option – all other house types 2 storey; 

B) 198 no. apartments [with balconies] in 5 no. apartment buildings (Block A – 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys along internal access road in northern portion of site) comprising 46 no. 1 bedroom apartments & 152 no. 2 bedroom apartments;

C) 15 no. 2 bedroom duplex apartments [with terraces or balconies] and 15 no. 3 bedroom duplex apartments in 3 no. 3 storey duplex buildings;

D) 8 no. 5 dwelling 3 storey corner blocks [with terraces or balconies] (each comprising, 1 no. 1 bedroom apartment, 2 no. 2 bedroom apartment & 2 no. 3 bedroom units) – 40 no. units in total;

E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total;

F) Provision of 2 no. creches (ground floor of Apartment Building C, approx. 195 sq. m), and a 2 storey creche of c. 443 sq. m beside internal access loop road, ESB kiosks, associated single storey bicycle storage and refuse storage buildings;

G) Provision of open space within the development (including playground areas and communal open space areas); all ancillary landscape works with public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths;

H) Access to the subject site will be from 3 no. new junctions onto Academy Street, and a new pedestrian access onto the Dublin Road (R147) at the southern end of the site and includes new signalised junction and improvements on the Dublin Road (R147), as well as 875 no. car parking spaces and 581 no. cycle spaces (northern vehicular access to also facilitate future adjoining school site campus). The proposal includes works to the former access road to Belmount House (a protected structure) as well as landscaping works to associated woodland area;

I) Surface water and underground attenuation systems as well as all ancillary site development works (reprofiling of site as required) as well as to drainage services;

J) Temporary marketing signage for a period of 3 years (located on Academy Street);

K) All associated site development and landscape works all on a site of c. 15.1 hectares; 

To find out more details on this Residential Development in Meath Started on 16th November 2021 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Meath


Address:
Limekilnhill

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL