The development consists of 4 no. 4 bed semi-detached two storey dwellings and 2 no. 4 bed detached two storey dwellings (total 6 no), new entrance and access roadway off St. Oliver’s Road with turning area, associated paths and public amenity area. The development also includes the installation of a temporary BAF secondary wastewater treatment system to serve the development on site with connection to mains sewer, surface water attenuation system, new boundary walls, new set back wall fronting St. Oliver’s Road previously granted permission under planning reference no. TA/190986 and connection to all mains services together with all associated site works.
To find out more details on this Residential Development in Meath Granted permission on 23rd January 2024 take the free trial here.