Development at Unit 5/6 Cedar Drive, St Margarets, Coldwinters Dublin Airport Logistics Park, Co. Dublin, K67 E0C5. a) Construction of an open mezzanine floor at first floor level (587m2), b) Change of use from warehouse to office with the construction of 3no. internal office structures with a total floor area of 121m2 to be located within the existing warehouse, c) New external single door to the north and south elevations, d) Illuminated high level external signage to the north and south elevations, and all associated site works.
To find out more details on this Office Development in Dublin Granted permission on 5th March 2024 take the free trial here.