21 Feb 2024 An Bord Pleanala grants permission with conditions

21/01/2023: An appeal has been lodged to An Bord Pleanala and a decision will be made by 17th May 2023.

The construction of 52 no. Residential dwellings to include: 12no. Type a1 3-bed detached dwellings, 24 no. Type b1 3-bed semi – detached dwellings, 4 no. Type c1 4-bed detached dwellings, 2 no. Type d1 3-bed detached dwellings, 1 no. Type d2 3 bed detached dwellings, 8 no. 2-bed terraced dwellings and 1 no. 1-bed accessible dwelling.

To find out more details on this Residential Development in Kerry Granted permission on 21st February 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Kerry


Address:
Ballyard Road

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL