29 Nov 2024
Phase 1C consists of the construction of 12no. residential units total in Block 2 including: 6no. ground floor apartments and 6no. duplexes above.
Phase 1B consists of the construction of 16no. residential units total in Block 1 including: 8no. ground floor apartments and 8no. duplexes above.
Phase 1A consists of the construction of 70 no. residential units total including: 46no. two-storey semi-detached houses, 8no. two-storey terraced houses, 5no. single-storey terraced houses, 1no. single-storey detached house and 10no. two-storey detached houses.
Arden road housing eastern development comprising:
(i) the construction of 85 no. Residential dwellings as part of an overall masterplan for this land holding.
(ii) construction of a community creche building,
(iii) construction of a vehicular access point on the arden road, and construction and modification of the vehicle access and egress point to the ballin ri residential estate including modification to, and tie-in with the existing footpath and road infrastructure along the arden road (r421) and ballin ri residential estate,
(iv) car parking including 8no electric vehicle charge points and bicycle parking facilities,
(v) associated landscaping,
(vi) all associated site development works including roads, paths, paving, parking bays, drainage, street lighting, modification to existing ground levels and boundary treatments, and all other necessary services for the servicing of the proposed residential development.
To find out more details on this Residential Development in Offaly Started on 29th November 2024 take the free trial here.

