For the development consisting of the following: 1. Construction of a commercial building (3 Storey), 2. Construction of 2 no. (2 1/2 storey) duplex buildings to provide for 7 no. ground floor commercial start up units and 8 no. 2 bed upper floor apartments. 3. Construction of 35 no. houses consisting of: a. 10 no. 4 bedroom 2 storey semi-detached houses, b. 1 no. 4 bedroom 2 1/2 storey end of terrace house, c. 14 no. 3 bedroom 2 storey semi-detached houses, d. 2 no. 3 bedroom 2 storey end/mid terrace houses, e. 2 no. 2 bedroom 2 storey semi-detached houses, f. 6 no. 2 bedroom 2 storey terraced houses. 4. Provision of communal open space area with playground, private open space, public lighting, soft and hard landscaping and revised boundary treatments. 5. Car parking including dedicated EV charge spaces, ducting to all spaces for future electric charging points. 6. Provision of 2 no. vehicular entrances onto Pier Road. 7. Proposed pedestrian footpath along Pier Road. 8. Provision of bicycle and bin storage. 9. Provision for ESB Sub station. 10. Connection to public sewer and provision for adjoining house to the north-east (Eircode H91DX8R) to connect to this sewer network, together with the decommissioning of the existing septic tank. 11. Connection to public watermain, surface water drainage, together with all associated site works and services. A Natura Impact Statement is submitted to the planning authority with this application. Gross floor space of proposed works: 4,028.00 sqm (house/s), 60 sqm (ESB sub station), 728.80 sqm (apartment/s) & 823 sqm (comm/ind)
To find out more details on this Residential Development in Galway Granted permission on 8th January 2025 take the free trial here.

