13 Dec 2024
Cherrywood T13 (CN2), Cherrywood Village, Cherrywood, Dublin 18 – It is proposed to construct a new 3 storey residential building consisting of apartments at ground floor and duplex units at first and second floor, located in Cherrywood, Co. Dublin.

13 Dec 2024
Cherrywood T13 (CN3), Cherrywood Village, Cherrywood, Dublin 18 – It is proposed to construct a new 3 storey residential building consisting of apartments at ground floor and duplex units at first and second floor, located in Cherrywood, Co. Dublin.

13 Dec 2024
Cherrywood T13 (CN1), Cherrywood Village, Cherrywood, Dublin 18 – The apartment building consists of residential accommodation at ground, first, second and third levels. The ground level contains ancillary areas including Elec Meters, Sprinkler Tank Room, Refuse Store, Maintenance Store and a Bulky Storage.

Residential development consisting of 56 no. residential dwellings (total c.5151sqm GFA) in a mixture of apartments and duplex units, together with a standalone childcare facility (c.772.5 sqm GFA), all in a range of buildings of 3 to 4 storeys in height on a development tile (T13) of approximately 0.8ha. The overall development proposed comprises of the following: 30 no. apartments in 1 no. block comprising 16 no. 1 bed units and 14no. 2 bed units. 26 no. own door duplex buildings, contained in 2no. 3 storey buildings (Buildings 3 and 4), Building 3 consists of 7no. 2 bedroom units and 7 no. 3 bedroom units, Building 4 consists of 6no. 2 bedroom units and 6 no. 3 bedroom units. Private communal amenity open space (c.635sqm) a 3 storey childcare facility (c.772.5sqm). Provision of 78 no. surface level car parking spaces with 12 no. spaces allocated as creche spaces and 66 no. spaces allocated to the residential development. 94 no. surface level bicycle parking spaces, 2 no. motorcycle parking spaces, provision of a pedestrian/cycle link between Castle Street and Beckett Park (including an entrance to Beckett Park) and all associated and ancillary site development and infrastructural works, including the provision of bike stores and bin stores, ESB substation, switch room and generator room, hard and soft landscaping and boundary treatment works.

The proposed development also consists of minor amendments to the existing Beckett park (permitted and constructed pursuant to Reg Ref DZ15A/0814) comprising approximately 58.5m of new surface water drainage network which will connect the development to the existing surface water drainage network in Beckett Park (constructed under Reg Ref DZ15A/0814) and also 1.8M high railing to the boundaries to Beckett Park with the T13 development tile inclusive of park entrance gates where the new pedestrian/cycle link proposed connects to Beckett Park (both the boundary fence and entrance gate were permitted underReg Ref DZ15A/0814).

A new vehicular access serving the proposed development is provided off Castle Street and is an amendment to Roads Phase 1 permitted underDZ15A/0758 (as extended by DZ15A/0758/E and amended by DZ20A/0399 and DZ21A/0664. The application also provides for the use of existing roads/services permitted under DZ15A/0758 (as extended by DZ15A/0758/E and amended by DZ20A/0399 and DZ21A/0664).

To find out more details on this Residential Development in Dublin Started on 13th December 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Address:
Laughanstown And Brennanstown

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL