The development will consist of Phase 3C as well as roads, services and public open space relating to the overall Phase 3 Ladywell lands as follows:

A) 75 no. dwellings comprising 68 no. houses consisting of 22 no. 2 bedroom dwellings (House Types E1, E2, E4, E6, E7, E8, E9, G1, G2, G3, G4, G5], 41 no. 3 bedroom dwellings (House Types D1, D2, F1, F2, F3, F4, F4A, F5, F5A, N1, N2, N3], 2 no. 4 bedroom detached dwellings (house type M1] – all 2-storey), & 3 no. 5 bedroom detached dwellings [House Type K1 – 2.5 storeys – 3 floors), (in a mixture of semi-detached, terraced, end of terrace and detached units); all with associated private open space; B) 7 no. 1 bedroom apartment units consisting of 3 no. 1 bedroom triplex units (T1, T2, T3] in a 3-storey building, 4 no. 1 bedroom Maisonettes [Apartment Types P1 & P2] in 2 no. 2-storey buildings, (all with private open space); provision of single storey cycle parking; bin stores; and ESB substations, solar panels on roofs; as well as 238 no. surface car parking spaces;

C) Public Open Space of c. 1.34 hectares (Phase 3C -c. 0.38 ha), (with additional 0.48 hectares of incidental open space) as well as communal (c. 0.06 ha) and private open space; all associated landscaping and drainage works (including attenuation] with public lighting, planting and boundary treatments, including regrading/reprofiling of site where required;

D) Provision of Class 1 Public Open Space (c. 0.65 hectares), with play equipment (accessed from Hamlet Lane) located to the west of Bremore Pastures and Hastings Lawn, south of Flemington Lane, [proposal includes alterations to part of the Class 1 public park and associated works approved under Reg. Ref. F15A/0550];

E) Provision of roads and services infrastructure (surface water, foul and water supply) to facilitate the development of the remainder of Phase 3 lands (Phases 3A, 3B & 3D) including public lighting, SuDS drainage and services infrastructure, as well as vehicular and pedestrian connections to the ‘Boulevard Road’ and all associated landscaping and ancillary site development works;

F) Signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122) as well as pedestrian crossings along Boulevard Road;

An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application.

Glenveagh Homes Limited, intend to apply for a 10-year planning permission for development (on lands of c. 6.29 ha.) relating to: ‘Phase 3’ to be known as ‘Ladywell’, within the townlands of ‘Clonard or Folkstown Great’, ‘Clogheder’ & ‘Flemingtown’, Balbriggan, Co. Dublin – (Phase 3 lands bounded generally by undeveloped lands to the north, undeveloped lands to the south, Boulevard Road to the east, and undeveloped lands to the west (to the rear of local road L1130). The proposal includes a separate site of Class 1 Public Open Space of c. 0.65 hectares in the adjoining townland of Flemington to the north (accessed from Hamlet Lane, Bremore Pastures Drive, Balbriggan).

To find out more details on this Residential Development in Dublin Started on 7th February 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Dublin


Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL