29 Jan 2024
Construction of Duplex Block A 74 to 89 Bailey Hill, Navan, Co Meath
03 Jan 2023
The construction of 44 to 51 Bailey Hill
15 Oct 2020 Construction commenced of 22 residential dwellings (units 36 to 43 and 52 to 65)
The site is bounded to the southeast by the N51 National Road, to the west by the former Navan to Kingscourt railway line and to the north by the rear gardens of 7 no. detached residential properties.
The proposed development will consist of: 99 no. residential units comprising 32 no. duplex/apartments set out in 2 no. 2 storey over lower ground floor blocks: and 67 no. 2 storey detached and semi-detached houses. The duplex/apartments will consist of: 16 no. 2-bed 1 storey apartment units at lower ground floor level (c. 75.5 sqm each); and 16 no. 3-bed 2 storey duplex units at ground floor and first floor level (c. 104.5 sqm each). The houses will consist of: 12 no. Type A 2 storey 4-bed semi-detached houses (c. 133.9 sqm each); 35 no. Type B 2 storey 3 – bed semi-detached houses (c. 112.0 sqm each); 4 no. Type B1 2 storey 3-bed semi-detached houses (c. 114.5 sqm each); 6 no. Type C 2 storey 3-bed semi-detached houses (c.110.0 sqm each); 7 no. Type D 2 storey 4-bed semi-detached houses (c. 127.3 sqm each); 2 no. Type C1 2 storey 3-bed detached houses (c. 110.0 sqm each); and 1 no. Type D1 2 storey 4-bed detached house (c. 127.3 sqm). The development will also include: a 2 storey creche (c. 130.5 sqm) with associated play area (c.156 sqm) and 5 no. carparking spaces; 2 no. bin storage buildings (c. 18.7 sqm each) and adjoining covered bicycle shelters (c. 22.6 sqm each) providing 20 no. bicycle spaces each; 2 no. car parking spaces on the curtilage of each house and 60 no. communal parking spaces for the apartment/duplex units; 2 no. landscaped public open spaces (c. 1,730 sqm and 2,930 sqm); internal access roads; a footpath and cycleway along the N51 National Road; a new vehicular access from the N51 National Road and associated revised junction layout; all ancillary landscaping and boundary treatments; drainage arrangements; and associated site development works, all on a site of c. 3.53 ha.
To find out more details on this Residential Development in Meath Started on 15th October 2020 take the free trial here.