1. Construction of 82 no. residential units across 12 no. building blocks and 2 no. detached houses as follows
(A) Block A consists of a 1-3 storey building, comprising of a 3 no. 2 bed ground floor apartments, 2 no. 2 bed upper floor apartments and 1 no. first floor 1 bed apartment
(B) Block B consists of a 3 storey building, comprising of 7 no. 1 bed ground floor apartments and 7 no. 2 bed upper floor apartments
(C) Block C consists of a 3 storey building, comprising of 4 no. 1 bed ground floor apartments and 4 no. 2 bed no. upper floor apartments
(D) Block D consists of a 3 storey building, comprising of 7 no. 1 bed ground floor apartments and 8 no. 2 bed upper floor apartments, with integrated bin store and integrated bike store
(E) Block E consists of a 2 storey building, comprising of 4 no. 3 bed terraced houses
(F) Block F consists of a 2 storey building, comprising of 3 no. 3 bed terraced houses
(G) Block G consists of a 2 storey building, comprising of 3 no. 3 bed terraced houses
(H) Block H consists of a 2 storey building, comprising of 3 no. 2 bed ground floor apartments and 3 no. 2 bed no. upper floor apartments, with integrated bin store and integrated bike store
(I) Block I consists of a 2 storey building, comprising of 4 no. 1 bed ground floor apartments and 4 no. 1 bed no. upper floor apartments
(J) Block J consists of a 2 storey building, comprising a staggered terrace of 7 no. 3 bed houses
(K) Block K consists of a 2 storey building, comprising of 3 no. 3 bed terraced houses
(L) Block L consists of a 2 storey building, comprising of 3 no. 3 bed terraced houses
(M) 2 No. 2 storey 4 bedroom detached houses
2. Provision of vehicular and pedestrian entrance off Gleann Rua road (L-50378 road) to the south-east, including 2 no. pedestrian crossings
3. Provision of 2 no. pedestrian connections with Murrough Drive and Beach Avenue respectively
4. Revised boundary treatments and revised site boundaries
5. Provision of public open space areas (to include for play spaces), private open space areas, bicycle parking, footpaths, public lighting, hard and soft landscaping
6. Provision of Car parking to include for EV ducting to all spaces.
To find out more details on this Residential Development in Galway Applied for on 17th October 2025 take the free trial here.

