16 Jan 2024 construction of 75. no residential dwellings, vehicular site entrance from Granges Rd, a shared pedestrian and cycle route through from Granges Road to Lousybusy Lane, boundary treatments, public open space, provision of foul and surface water connections/disposal, and all associated site works.
For development. The development will consist of the proposed phase 1 construction of 75. no residential dwellings consisting of 2 no type A – five-bedroom detached, 2 No. Type A1 – five bedrooms detached, 2 No. Type A1 – five bedrooms detached, 2 No. Type A2 – five bedrooms detached, 9 No. Type B – four bedroom detached, 2 No Type B1 – four bedrooms detached, 7 No. Type C – four bedroom detached, 26 No. Type D – four bedroom semi-detached, 3 No. Type E – Three bedrooms terraced, 2 No. three-level apartment buildings comprising of 1 no. one-bedroom apartment, 9 No. two-bedroom apartments, and 1 No. three-bedroom apartment in each building (22 No. apartments in total) 5 no. detached garages; vehicular site entrance from Granges Rd, a shared pedestrian, and cycle route through from Granges Road to Lousybusy Lane, boundary treatments, public open space, provision of foul and surface water connections/disposal, and all associated site works.
To find out more details on this Residential Development in Kilkenny Started on 16th January 2024 take the free trial here.