For
1. Decommissioning and removal of existing temporary on-site treatment plant and polishing filter plus new connections to be made to existing public services
2. Construction of 16no. residential dwellings consisting of: 1no. Type B – 4 bed detached dwelling 4no Type E – 3 bed terraced dwellings, 4no Type F – 3 bed terraced dwellings, 3no Type I – 3 bed terraced dwellings, 2no Type J1 – 4 bed terraced dwellings & 2no Type J2 – 3 bed terraced dwellings.
3. Extension of the existing internal estate access road.
4. Provision of traffic calming measures to existing estate access road.
5. Revisions to existing footpath network to provide accessible pedestrian crossing locations & extension of existing footpath network.
6. Provision of bicycle parking, site landscaping, play spaces and public lighting
7. Provision of residential carparking and all associated development works. Gross floor space of proposed works: 1443.70 sqm.

To find out more details on this Residential Development in Galway Applied for on 18th November 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Galway


Address:
Pairc Na Ri

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL