The development will consist of the following:
• demolition of the existing single storey rear extension with double height atrium (130sqm),
• construction of a new single storey rear extension (265sqm),
• external alterations including alterations to be first-floor window openings, alterations to the first-floor balustrade, replacement of the existing fire escape, addition of PV panels, formation of rooflights,
• internal alterations including reconfiguration of the internal layout and a new staircase,
• general repair and refurbishment of the original building (372sqm) including thermal upgrades, replacement of windows and doors and repointing the front façade,
• site works including widening of existing vehicular gates, the provision of a new pedestrian entrance gate to the front, the addition of 10 cycle spaces and 2 no. electric car charging points,
• landscaping, SuDS drainage and all ancillary works necessary to facilitate the development.

To find out more details on this Public Building Development in Dublin Started on 3rd June 2025 take the free trial here.


Address:
160 Merrion Road

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL