22 Apr 2024
Construction of 12 no. apartments consisting of 8 no. 1-bed apartments and 4 no. 2-bed apartments including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
–
The construction of 67 no. residential units, a new single storey creche, single storey health centre and a 3 storey, 90 bed nursing home. The residential units will consist of: 5 no. 1-Bed semi-detached bungalows, 5 no. 2 bed semi-detached bungalows, 13 no. 2 bed mid-terrace bungalows, 2 no. 2 storey 4-bed semi-detached houses, 2 no. 2 storey 4-bed mid terrace houses, 14 no. 2 storey 3 bed semi-detached houses, 14 no. 2 storey 2 bed mid-terrace houses and 1 no. apartment building consisting of: 8 no. 1-bed apartments and 4 no. 2-bed apartments over 2 storeys, located as follows, (2 no. 2 bed and 4 no. 1 bed apartments on ground floor, 2 no. 2 bed and 4 no. 1 bed apartments on first floor), the proposed development will also include new internal roadways and footpaths, a proposed new distributor road to the north and east of proposed development, pedestrian/cycle access off the existing Tyone Road to the west of the site, vehicular access from the existing Ormond Drive, south of proposed site, new vehicular and pedestrian access, new boundary treatments, landscaping, drainage, site services including new ESB Medium Voltage (MV) substation building and all ancillary site works.
To find out more details on this Residential Development in Tipperary Started on 22nd April 2024 take the free trial here.

