Development which will consist of the construction of a concrete services yard, approx. 46m long by 25m wide, with a total area of approx 1,150 sqm surrounded by a 2.4m high pallisade fence located to the east (rear) of the main 3m healthcare building. Facilities within the yard to consist of
(1) Fire water tank approx. 9.9m diameter, 10.6m high
(2) Single storey pump house approx. 10.2m long, 3.6m wide and 3.4m high
(3) Electrical room approx 4.1m long, 3.1m wide and 3.5m high
(4) Relocation of existing emergency generator approx. 10m long, 3m wide and 3.5m high and new bunded diesel tank. The construction of a services bridge approx. 28.5m long, 2.7m wide and 8m high from the services yard to the rear of the existing 3m building with maintenance access stairs to same including all associated site works and services.
To find out more details on this Factory Development in Westmeath Granted permission on 23rd January 2024 take the free trial here.