The proposed development will consist of a largescale residential development (LRD), comprising of 134no. residential dwellings as follows: 65no. houses consisting of 10no. 4-bed dwellings and 55no 3-bed dwellings 51no. townhouses consisting of 32no. 3-bed units and 19no. 2-bed units and 18no. apartments consisting of 12no. 2-bed units and 6no. 1-bed units. The proposed development also includes a creche with capacity to accommodate 102no. children. The proposed development will include the demolition of existing agricultural sheds provision for car parking, including EV charging points and bicycle parking. The proposed development will also include the provision of private, communal, and public open spaces internal roads and pathways pedestrian and cyclist routes hard and soft landscaping and boundary treatments waste storage plant signage a new vehicular and pedestrian access with raised table and pedestrian crossing onto the Ross Road to serve the development connection to the existing vehicular access serving the dwelling Blossom Gate to provide vehicular access to proposed unit G fronting onto the Ross Road public lighting 2no. substations all associated site development works and all drainage and foul sewer infrastructure and network works including connections to the existing networks and nature-based SuDS measures. A Natura Impact Statement (NIS) accompanies this application and has been submitted to the Planning Authority. The application and NIS may be inspected online at the following website: www.rossroadlrd.ie.
To find out more details on this Residential Development in Kerry Granted permission on 30th September 2025 take the free trial here.

