EXPP: PROTECTED STRUCTURE:
– Basement level: exposing existing walls at locations for future proposed door opes between B.15 and B.38 and between B.20 and B.37
– Basement level: proposed hole in floor slab in plantroom B.41
– Basement level: proposed hole in floor slab in strong room B.11
– Basement level: Opening up of walls to expose structure in floor above, where it proposed to remove the goods hoist within furniture store B.21
– Lower Ground Floor level Opening up of walls to expose structure in floor above, where it proposed to remove the goods hoist within Hoist Lobby LG.12.
To find out more details on this University Development in Dublin Applied for on 26th February 2024 take the free trial here.