29 March 2024
Construction of dwelling houses and associated site works – Unit Nos 1-35 incl. MUNFINE PARK, Kilmalum, Blessington, Co. Kildare.
Construction of Dwelling houses and associated site works – Unit Nos. 36-69 incl. MUNFINE PARK, Kilmalum, Blessington, Co. Kildare.
For proposed residential development (69 No. residential units) and a primary school (circa 2,503 sq. metres). The proposed development includes measures to upgrade the Kilmalum Road and Culvert over the Deerpark Watercourse, from the Roundabout junction of Kilmalum Road with Kilmalum Crescent to the culvert over the Deerpark Watercourse in Co. Wicklow and Co. Kildare. These works will comprise replacement of the existing dished curb and crossing with a new ramped pelican pedestrian crossing, improved pedestrian and cycle connections, new ‘in-only’ vehicular entrance onto the Kilmalum Road, underground connection to the existing watermain, upgrade to the existing pipe culvert within the proposed development and proposed new culvert beneath Kilmalum Road together with proposed main vehicular entrance onto the Kilmalum Road with new turning lane, pedestrian crossing and road widening realignment along Kilmalum Road. Permission is sought for proposed residential development comprising of: 7 No. 1 Bedroom Units, 8 No. 2 Bedroom Units, 40 No. 3 Bedroom Units & 14 No. 4 bedroom units to be provided in a mix of unit types as follows: 4 No. detached houses (2 to 2.5 storey), 48 No. semi-detached houses (2 to 2.5 storey), 3 No. terraced houses (2 storey), 7 No. ground floor own door apartment units & 7 No. duplex units (2.5 storey) together with all associated landscaping & site development works including estate roads, footpaths, cycle tracks, car parking, bins & bicycle storage, boundary treatment, services infrastructure including watermains, foul sewerage, surface water sewerage & attenuation (including pond & swale). Permission sought for proposed primary school (2-storey) comprising of 16 No. classrooms & ancillary accommodation (circa 2,503 sq. metres) together with site development works including play areas, vehicular/cycle/pedestrian access, car parking, bicycle parking, public open space, landscaping & boundary treatment. A total of approx 1.4Ha of public open space is provided within the Phase 1 site area of which approx 0.9Ha is provided as part of a linear park along the Kilmalum Road and up through the centre of the site along the seasonal conduit/ proposed swale ( Within the flood zone A), and approx 0.44Ha is provided within the next housing site area ( Which is approx 19% of the net housing site area)
To find out more details on this Residential Development in Kildare Started on 29th March 2024 take the free trial here.

