30 Sep 2024
Construction of 13 No. terraced houses designed in 4 separate blocks and all landscaping, boundary treatment works, drainage connections, site and ground works at Saint Jude, Trim Road, Summerhill, Co. Meath

The proposed development will consist of the construction of 14 No. terraced houses designed in 4 rows. Six No. 2 Bed 4P 2 Storey and Eight No. 3 Bed 5P 2 Storey units together with the required open space.
Remodelling and widening of the existing vehicular entrance from the R158 to create a shared surface access road. New pedestrian and cycle access point to Cherry Court Estate to the south of the proposed development. Additional works include the provision of vehicular access, solar panels at roof level, all landscaping, boundary treatment works, new drainage connections to public foul and surface water mains as well as all associated and ancillary site and groundworks.

To find out more details on this Residential Development in Meath Started on 30th September 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Meath


Address:
Saint Jude

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL