30 Sep 2024
Construction of 13 No. terraced houses designed in 4 separate blocks and all landscaping, boundary treatment works, drainage connections, site and ground works at Saint Jude, Trim Road, Summerhill, Co. Meath
The proposed development will consist of the construction of 14 No. terraced houses designed in 4 rows. Six No. 2 Bed 4P 2 Storey and Eight No. 3 Bed 5P 2 Storey units together with the required open space.
Remodelling and widening of the existing vehicular entrance from the R158 to create a shared surface access road. New pedestrian and cycle access point to Cherry Court Estate to the south of the proposed development. Additional works include the provision of vehicular access, solar panels at roof level, all landscaping, boundary treatment works, new drainage connections to public foul and surface water mains as well as all associated and ancillary site and groundworks.
To find out more details on this Residential Development in Meath Started on 30th September 2024 take the free trial here.