3 Jun 2025 An Bord Pleanala Grant permission with conditions

The development will consist of the construction of a new storage shed and an external paved yard to facilitate the importation, storage and processing of road plannings with an application site of c. 1.0 hectares. The development will comprise- Construction of an external yard comprising a reinforced concrete ground bearing slab (c.2032m2) to store and process imported road plannings. Construction of a portal frame storage shed (c.2053m2) to store processed road plannings. Installation of sub-surface drainage to collect surface water run-off which will discharge via a silt trap and hydrocarbon interceptor to the adjoining quarry floor (and to the ground thereafter).

To find out more details on this Warehouse Development in Cork Granted permission on 3rd June 2025 take the free trial here.


Address:
Burgesland And Ballynabointra

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL