The combining, altering and extension of the existing two three-storey over basement buildings to form a twenty-four unit apartment development consisting of thirteen one-bedroom apartments and eleven two-bedroom apartments. The proposals involve the restoration/ refurbishment of the existing front fascades and cast iron railings, internal alterations to the main front structure of the existing buildings, the demolition of the rear return structures and out-buildings, the construction of a new 3-storey over basement extension to the rear of the building, bicycle parking, bin store and associated site works at 21/21A Barrington Street. Both of these properties are protected Structures.
To find out more details on this Residential Development in Limerick Started on 1st December 2025 take the free trial here.

