17 Apr 2024
(i) The construction of 17 number dwellings; 4 number two storey semi-detached dwellings; 3 number two storey terraced dwellings and 10 number two & three storey detached dwellings.
(ii)The construction of two number single storey detached garages.
–
Application for:
(i) The construction of 17 number dwellings; 4 number two storey semi-detached dwellings; 3 number two storey terraced dwellings and 10 number two & three storey detached dwellings. Each dwelling is served by a rear garden private amenity space, on site and or side car parking. House no’s 53,55,57,59 to have 2 house type options available, type 5A & 5 B for house no’s 53,57 & 59 and type 5C & 5E for house no. 55.
(ii)The construction of two number single storey detached garages at house no’s 45 & 59.
(iii) Provision of public open space to serve the development (shared with the existing Ard Caladh estate), street lighting, internal roadways with connection to upper cork hill via the existing road network within the completed ard caladh and cnoc aoibhinn & gort aoibhinn estates, footpaths, foul and sud’s surface drainage, landscaping & boundary treatments and all ancillary infrastructural and engineering works necessary to facilitate the development.
To find out more details on this Residential Development in Cork Started on 17th April 2024 take the free trial here.