09 Apr 2024
a) 16 houses in total consisting of three 5-bed with study/office three-storey end-of-terrace houses; four 4-bed with study three-storey mid-terrace houses; three 4-bed with study three-storey end-of-terrace-houses; two 4-bed with study three-storey semi-detached houses; two 3-bed semi-detached dormer houses; one 2-bed detached dormer house; one 3-bed detached dormer house
b) pedestrian connection link to St Joseph’s Villas
c) vehicular and pedestrian access from Galway Road and d) all ancillary site development works and services. The development is located within the curtilage of a protected structure, ref no.079, Boundary Marker, Galway Road. (The development is an amendment of the previously granted development, planning ref 18/7226).

To find out more details on this Residential Development in Westmeath Started on 9th April 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Westmeath


Address:
Baylough (Bellaugh) And Bogganfin

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL