09 Apr 2024
a) 16 houses in total consisting of three 5-bed with study/office three-storey end-of-terrace houses; four 4-bed with study three-storey mid-terrace houses; three 4-bed with study three-storey end-of-terrace-houses; two 4-bed with study three-storey semi-detached houses; two 3-bed semi-detached dormer houses; one 2-bed detached dormer house; one 3-bed detached dormer house
b) pedestrian connection link to St Joseph’s Villas
c) vehicular and pedestrian access from Galway Road and d) all ancillary site development works and services. The development is located within the curtilage of a protected structure, ref no.079, Boundary Marker, Galway Road. (The development is an amendment of the previously granted development, planning ref 18/7226).
To find out more details on this Residential Development in Westmeath Started on 9th April 2024 take the free trial here.

