22 January 2024
Block E – construction of 3 story duplex units – 8 No units at Daneswell Place Glasnevin Dublin 9
Block D – Construction of new 6 story apartment block consisting of 48 units @ Daneswell Place Glasnevin Dublin 9
Block E – construction of 3 story duplex units – 8 No units at Daneswell Place Glasnevin Dublin 9
06 March 2023 An Bord Pleanala grants permission with conditions
The proposed development will consist of amendments to the development permitted on site under DCC Reg. Ref.: 3665/15 (ABP ref 29N.246124), as amended by DCC Reg. Refs.: 4267/17 and 2133/18 (which are constructed/ currently under construction) and extended by DCC Reg. Ref.: 3665/15X2.
The proposal will include the construction of 168 no. apartment units (12 no. studios, 72 no. 1 beds, 68 no. 2 beds, and 16 no. 3 beds) within 5 no. blocks ranging in height from 1 to 6 storeys.
• Block A ranges in height from 1 to 5 storeys and provides 28 no. residential units.
• Block B ranges in height from 5 to 6 storeys and provides 40 no. residential units.
• Block C ranges in height from 5 to 6 storeys and provides 44 no. residential units.
• Block D ranges in height from 4 to 6 storeys and provides 48 no. residential units.
• Block E is 3 storey duplex block and provides 8 no. residential units.
All residential units are provided with associated private balconies/ terraces to the north/ south/ east/ west.
The proposal also includes a crèche (c. 235.6sqm), café (c. 77.4sqm), resident amenity space (c. 193.8sqm), and an amenity management suit (c. 43.8sqm) in Block A and a resident’s gym (c. 109sqm) in Block B.
Vehicular/ pedestrian/ cyclist accesses will be from Botanic Road. The proposal also includes the replacement of the existing vehicular access from Botanic Road at the south-western corner of the site with a pedestrian and cyclist access.
The proposal will also include car, cycle and motorcycle parking at surface and basement level, all associated site development works, public and communal open spaces, roof gardens, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations) will be provided.
To find out more details on this Residential Development in Dublin Started on 22nd January 2024 take the free trial here.