16 Sep 2024
Construction of a 3-storey duplex building (Block 1), comprising 6 no. 3-bed 2-storey duplex units over 6 no. 2-bed 1-storey ground floor units(12 no. units total) on plot numbers 140-151.

16 Sep 2024
Construction of a 3-storey duplex building (Block 3) comprising 6 no. 3-bed 2-storey duplex units over 6 no. 2-bed 1-storey ground floor units (12 no. units in total) on plot numbers 164-175.

16 Sep 2024
Construction of a 3-storey duplex building (Block 2)comprising 6 no. 3-bed, 2-storey duplex over 6 no. 2-bed 1-storey ground floor units (12 no. units in total) on plot numbers 152-163.

Large Scale Residential Development (LRD) at this site of c.8.6ha at “Leixlip Gate”, in the townlands of Kilmacredock Upper and Castletown, Leixlip, Co Kildare. The site is located to the east of the R449, north of the M4, and south of the “Harpur Lane” residential and creche development currently under construction (Reg. Ref. ABP-307223-20, and as amended by KCC Reg Ref.22/1226 and Reg. Ref. 23/606). The development will consist of: Construction of 229 no. dwellings comprising: 139 no. 2-storey houses comprising 10 no. 2-bed, 119 no. 3-bed and 10 no. 4-bed units; 54 no. apartments within 1 no. 5-storey block comprising 25 no. 1-bed and 29 no. 2-bed units; 36 no. duplex units within 3 no. 3-storey blocks comprising 18 no. 2-bed and 18 no. 3 bed units; All with associated private gardens/ balconies/ terraces to the north/south/east/west elevations. 255 no. car parking spaces (including e-charging points) and 250 no. secure bike parking spaces (with residential spaces located within dedicated bicycle stores). Vehicular accesses to the development via the Harpur Lane development to the north with pedestrian/cyclist access via Harpur Lane and the R449 to the west. This includes a second access to Harpur Lane provided via the creation of a second permanent opening in the existing boundary demesne wall. Minor amendments to the permitted Harpur Lane development (Ref. ABP-307223-20) to provide the proposed accesses/connections and for connections to services. Provision of new open spaces and landscaped areas including a new public park to the south and west of the site. All associated site development works (including reprofiling of the land), boundary treatments, acoustic fencing (along the boundary with the R449 and M4 slip road), bin stores, ESB substations, public lighting; site services, drainage works and all associated infrastructure. Temporary permission (3 years) is also sought for the erection of an advertising signage adjacent to the R449 (total area c.9.29 sq.m).

To find out more details on this Residential Development in Kildare Started on 16th September 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Kildare


Address:
Leixlip Gate

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL