1 March 2024
Aderrig Phase 3 (T13, T15, T16-T21) Adamstown, Lucan, Co. Dublin comprising the construction of 17 No. new 2-storey detached and terraced houses including associated site development works.

Aderrig Phase 3 (Duplex T12) Adamstown, Lucan, Co. Dublin comprising the construction of a new 3-storey duplex block consisting of 10 No apartments and 10 No duplex units, including associated site development works.

Aderrig Phase 3 (Duplex T7) Adamstown, Lucan, Co. Dublin comprising the construction of a new 3-storey duplex block consisting of 10 No apartments and 10 No duplex units, including associated site development works.

26 Feb 2024
Aderrig Phase 3 (T5, T6, T9) Adamstown, Lucan, Co. Dublin comprising the construction of 8 No. new 2-storey houses including associated site development works.

Aderrig Phase 3 (Duplex T1) Adamstown, Lucan, Co. Dublin comprising the construction of a new 3-storey duplex block consisting of 10 No apartments and 10 No duplex units, including associated site development works.

Aderrig Phase 3 (T8, T10, T11, T14) Adamstown, Lucan, Co. Dublin comprising the construction of 20 No. new 2-storey terrace houses including associated site development works.

Aderrig Phase 3 (T2, T3, T4) Adamstown, Lucan, Co. Dublin comprising the construction of 10 No. new 2-storey houses including associated site development works.

25 Oct 2022
Aderrig Phase 2 (Duplexes T1, T4, T18, T25, T27) Adamstown, Lucan, Co. Dublin comprising the construction of 5 No. new 3 to 4-storey duplex blocks including associated site development works.

02/08/2022
Aderrig Phase 2 (Duplexes T3, T14, T26), Adamstown, Lucan, Co. Dublin comprising the construction of 3 No. new 3-storey duplex blocks including associated site development works.

28/07/2022 Aderrig Phase 2 (Duplexes T3, T14, T26), Adamstown, Lucan, Co. Dublin comprising the construction of 3 No. new 3-storey duplex blocks including associated site development works.

30/06/2022 Aderrig Phase 2 (Houses), Adamstown, Lucan, Co. Dublin comprising the construction of 123 No. new 2 & 3-storey terrace dwellings including associated site development works.

Development of 227 dwellings (24,513.8sq.m gross floor area); 95 3-bed, 2 storey terraced houses and associated gardens; 28 4-bed, 3 storey terraced houses and associated gardens; 48 3-bed, 2 storey duplex apartments over 48 2-bed apartments (3 storey buildings with 2 storey duplex over single level ground floor unit) and associated communal and private open space; 4 3-bed, 2 storey duplex apartments over 4 3- bed, 2 storey duplex apartments (4 storey buildings with 2 storey duplex over 2 storey duplex) and associated communal and private open space; all associated site and development works including roads, central public open space (0.12ha), car parking (361 spaces), bicycle parking (168 spaces), bin storage areas, 2 ESB substations (22sq.m), associated pedestrian footpaths and cycle paths, hard and soft landscaping and boundary treatment. A section of the East-West Avenue Road (referred to as Airlie Park Road) along the northern boundary of the site is included in the current application and 2 access points are proposed to this road; development is accessed from roads already approved or under construction. The road to the south (referred to as Adamstown Way) was permitted under SDZ06A/0005 and bounds the site to the south and 1 access point is proposed to this road. 4 access points are proposed to the east and west (2 each). The Celbridge Link Road permitted under SDZ17A/0009 bounds the site to the west and the north-south road to the eastern boundary (referred to as Linear Park Road) was permitted under SDZ20A/0017. 17 spaces were permitted under SDZ17A/0009 providing a total of 378 spaces for this development.

To find out more details on this Residential Development in Dublin Started on 6th July 2022 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Dublin


Address:
Development Area 8

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL