The Large Scale Residential Development (LRD) will consist of 175 no. residential units ranging in height from 2 to 6 storeys, a childcare facility, all boundary treatment and landscaping works, site services connections and all site development works to include:
a) The demolition of the existing two storey house ‘Winterwood’ measuring approximately 1,102 sqm, and associated outbuildings to include a security hut approximately 8.7 sqm, Bin Store 22 sqm and external storage shed 7.5qm.
b) The construction of 30 no. houses (A & B) over two to three storeys as follows: 16 no. 4 bed semi-detached houses over three storeys 6 no. 2 bed mid terraced units over two storeys 4 no. 3 bed end terraced units over two storeys 4 no. 3 bed semi-detached units over two storeys.
c) The construction of 145 no. apartment units in the form of 3 no. new apartment buildings as follows: Block C (6 storeys) comprising 61 no. apartments (33 no. 1 bed and 28 no. 2 bed) Block D (6 storeys) comprising 42 no. apartments (19 no. 1 bed and 23 no. 2 bed) Block E (6 storeys) comprising 42 no. apartments (19 no. 1 bed and 23 no. 2 bed).
d) 1 no. creche facility approximately 158 sq.m with associated outdoor play space of approximately 65 sq.m at ground floor level of Block C.
e) Total Public Open Space (approximately 2,347 sqm) and Communal Open Space (approximately 967 sqm). Each residential unit is afforded with associated private open space in the form of a garden/terrace/balcony.
f) The development will be served via a new vehicular entrance on Carpenterstown Road.
g) A total of 111 no. surface car parking spaces is proposed for the development to include 57 no. for the apartment units, 54 no. for the houses of which 46 are within the curtilage of the houses, 12 no. EV charging spaces, 3 no. accessible spaces and 3 no. car share spaces (driveyou). In addition 6 no. motorcycle parking spaces are proposed.
h) A total of 387 bicycle parking spaces are proposed in the form of 291 long term secure spaces and 96 no. secure short term visitor spaces.
i) 1 no. ESB substation at surface level.
j) All associated site and infrastructural works to include provision for water services foul and surface water drainage and connections internal roads, attenuation proposal permeable paving all landscaping and boundary treatment works green and blue roofs plant areas photovoltaic panels footpaths public lighting and electrical services.

To find out more details on this Residential Development in Dublin Granted permission on 27th May 2025 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Address:
Winterwood

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL