22 Jul 2025 Tender:
6,500 sq m extension of the existing Radiation Oncology Centre at Beaumont Hospital Campus including provision of all accommodation including 6 new linac bunkers etc. PET CT facility, general theatre/ procedure room, consult/exam rooms, ambulatory care Dept. offices, HR facilities and all other support accommodation. The works include some internal alterations in the existing facility as well as integration of the new and existing accommodation and some minor external works as necessary.
The proposed development will consist of the construction of a three storey (approx. 6,657 sq. m) extension to the existing Phase 1 St. Luke’s Radiation Oncology Centre in line with the objectives of the National Plan for Radiation Oncology, the demolition of the Medical Records Building (approx. 313.6 sq. m), demolition of existing Phase 1 entrance lobby and part demolition of existing link corridor (approx. 171.5 sq. m), modifications to the existing Phase 1 building elevation, the provision of photovoltaic panels on the roof of the existing Phase 1 and proposed Phase 2 buildings, the relocation of a gas skid, alterations to the existing set down area/access road to the front entrance of the building, modifications to the north staff car park, the extension of the surface car park to the south of the campus to provide an increase of 222 no. parking spaces (of which 145 no. are relocated from the proposed Phase 2 site and the existing northern car park), 34 no. bicycle parking spaces, pedestrian and wayfinding provisions, all associated landscaping, site services and site development works.
To find out more details on this Hospital Development in Dublin take the free trial here.