27/12/2024
Construction of 18no. 2½ storey dwellings and associated site works. This stage of the construction is to consist of 4no. detached dwellings, 2 units containing 3no. terraced and 2 units containing 4no. terraced. The housing numbers being developed are 1-4,11-16 & 23-30.
18/12/2024:
Block 1 Construction of a 3 storey building containing 1no. 2 bedroom apartment at ground floor level, 1no. 2 bedroom apartment at first floor level and 1no. 2 bedroom apartment at second floor level along with associated site works.
17/12/2024:
Block 2 Construction of a 3 storey building containing 1no. 2 bedroom apartment at ground floor level, 1no. 2 bedroom apartment at first floor level and 1no. 2 bedroom apartment at second floor level along with associated site works.
Block 3 Construction of a 3 storey building containing 2no. 1 bedroom apartments at ground floor level, 2no. 1 bedroom apartments at first floor level and 2no. 1 bedroom apartments at second floor level along with associated site works.
12/10/2022: Appeal lodged to An Bord Pleanala.
1. Demolish houses no’s 1, 2, 3 & 4, Ballymullen Road, Tralee.
2. Construct a residential development of 30 no. dwellings comprising:
(i) four 2.5 storey detached houses,
(ii) two terraces of three 2.5 storey houses and
(iii) two terraces of four 2.5 storey houses,
(iv) twelve apartments in three detached 3 storey buildigns.
3. construct a new vehicular and pedestrian access/egress at Ballymullen Road to serve the proposed develpment.
4. Carry out all associated works and all associated site works necessary to facilitate the propsosed development.
To find out more details on this Residential Development in Kerry Started on 17th December 2024 take the free trial here.