17 April 2024
Phase 1B.1 Development. BT4 Block 12 will consist of 3storey duplex with 2 apartments on ground floor and 2 duplex units above.
Phase 1B.2 development consists of 26 no. 3 bed (16 semi-detached and 6 end of Terrace) and 4 no. 2 bed mid terrace houses.
8 April 2024
Phase 1D.2 development consists of 14no. 3bed (8 semi detached and 6 end of terrace) and 9no. 2 bed mid terrace houses.
7 March 2024
Phase 1C.2 development consists of 16no. 3bed (12 semi detached and 4 end of terrace) and 6no. 2 bed mid terrace houses.
2 January 2024
Phase 1A.7 Development consists of 5 terraced houses and 4 no. 3bed semi-detached houses. Terraced houses comprise 3 no. 2bed mid terrace and 2 no. 3bed houses end of terrace.
Phase 1A.6 Development. BT4 Block 8 will consist of 3storey duplex with 2 apartments on ground floor and 2 duplex units above.
17 October 2023
Development consists of 5 terraced houses and 4 no. 3 bed semi-detached houses. Terraced houses comprise 3 no. 2 bed mid terrace and 2 no. 3 bed houses end of terrace.
Phase 1A.4 Development. BT4 Block 7 will consist of 2 apartments on ground floor and 2 duplex units above.
31 July 2023
The commencement relates to 4 no. Terrace Houses. Each unit is provided with its own independent entrance located at ground level.
Voyage Property Limited intend to apply to An Bord Pleanála (the Board) for permission for a strategic housing development with a total application site area of c.10.5 ha (with a substantive residential site development area of c.7.9 ha), on lands at the former Greenpark Racecourse, Dock Road, Limerick, principally bounded by existing undeveloped lands to the north, south and west and the adjoining Log na gCapall Housing Estate and Greenpark Avenue to the east. The application site includes the proposed access road (374m in length, including two lanes for vehicles, a roundabout, cycle lanes and pedestrian footpath) which connects to Dock Road at the north-western corner of the former Greenpark Racecourse lands and runs adjacent to the Limerick Greyhound Stadium.
The development, with a total gross floor area of c. 36, 879 sq m, will consist of the provision of 371 no. residential units comprising 157 no. two storey houses (consisting of 10 no. 4 bedroom units, 110 no. 3 bedroom units and 37 no. 2 bedroom units); 76 no. three storey duplex units (consisting of 14 no. 3 bedroom units, 38 no. 2 bedroom units and 24 no. 1 bedroom units) and 138 no. apartments (consisting of 92 no. 2 bedroom units and 46 no. 1 bedroom units arranged in 3 no. blocks ranging between 4 and 5 storeys together with communal amenity space) and a two storey childcare facility (550 sq m), including all private, communal and public open space provision (including balconies and terraces, private rear gardens and related play areas); surface car parking (510 no. spaces, including accessible spaces); car sharing provision; electric vehicle charging points; bicycle parking (long and short stay spaces); storage areas; internal roads and pathways; hard and soft landscaping and boundary treatments; piped infrastructural services and connections; plant; revised entrances and tie-in arrangements to adjoining roads, including emergency access via Log na gCapall and Greenpark Avenue and pedestrian and cyclist access via Log na gCapall; waste management provision; solar panels; attenuation tank and related SUDS measures; signage; public lighting; bulk earthworks; and all site development and excavation works above and below ground. Vehicular access to the site will be from Dock Road, via the proposed access road.
To find out more details on this Residential Development in Limerick Started on 31st July 2023 take the free trial here.