22 Oct 2025
CRECHE and apartment building at The Alder, Meadow Mill, Athy of:Phase 3 of a three phase housing development at Clonmullen & Gallowshill,, Geraldine Road,, Athy,, Co. Kildare.

26 Sep 2025
Phase 3 (TYPE H – 4 DWELLINGS) of a three phase housing development to include erection of (a) 50 residential units comprising 2 no. two storey 100m2 3 bedroom semi-detached dwelling houses (House Type F),16 no. two storey 89.5m2 2 bedroom town houses (House Type G), 3 no. two storey apartment blocks (Block I) comprising 6 no. ground floor 73.93m2 2 bedroom apartments and 6 no. first floor 49.76m2 1 bedroom apartments, 5 no. three storey duplex blocks (Block H) comprising 10 no. ground floor 73.93m2 2 bedroom apartments and 10 no. 100m2 3 bedroom duplex apartments on first and second floors to include car parking, bin stores, bicycle stores and boundary wall, (b) new site entrance off Geraldine Road with access road, cycleway and footpath (c) provide vehicular and pedestrian access to adjoining site to south west comprising 0.8453 hectares currently zoned “C” New Residential (d) all site development works associated with main access road and phase 3 of the three phase residential development including footpaths, roads, public lighting, attenuation ponds, surface water drains, foul sewer drains, water mains and all other utility services necessary to service the proposed development at Clonmullen & Gallowshill,Geraldine Road,Athy,Co. Kildare.

Phase 3 of a three phase housing development to include erection of
(a) 50 residential units comprising 2 no. two storey 100m2 3 bedroom semi-detached dwelling houses (House Type F),16 no. two storey 89.5m2 2 bedroom town houses (House Type G), 3 no. two storey apartment blocks (Block I) comprising 6 no. ground floor 73.93m2 2 bedroom apartments and 6 no. first floor 49.76m2 1 bedroom apartments, 5 no. three storey duplex blocks (Block H) comprising 10 no. ground floor 73.93m2 2 bedroom apartments and 10 no. 100m2 3 bedroom duplex apartments on first and second floors to include car parking, bin stores, bicycle stores and boundary wall
(b) New site entrance off Geraldine Road with access road, cycleway and footpath
(c) Provide vehicular and pedestrian access to adjoining site to south west comprising 0.8453 hectares currently zoned C New Residential
(d) All site development works associated with main access road and phase 3 of the three phase residential development including footpaths, roads, public lighting, attenuation ponds, surface water drains, foul sewer drains, water mains and all other utility services necessary to service the proposed development. This planning application is accompanied by a Natura Impact Statement. There is currently a valid planning application for phase1 of this three phase housing development, planning register 18/921 refers REVISED BY SIGNIFICANT FURTHER INFORMATION CONSISTING OF.

To find out more details on this Residential Development in Kildare Started on 26th September 2025 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Kildare


Address:
Clonmullen & Gallowshill

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL