(i) the provision of a new single storey office building of 242Msq; (ii) a fabrication workshop of 1943Msq with adjoining two storey mezzanine of 311.4Msq, with staff facilities at the ground floor and offices at the first floor; (iii) a paint shed of 200Msq; (iv) a gas bottle storage cage of 12Msq and; (v) Signage Pylon; (vi) ESB sub-station & switch room of 24Msq &; (vii) 30No. surface parking bay including 3No. EV charging bays, secure bicycle shelter, hard standing, hard & soft landscaping, boundary treatment to the perimeter of the site, entrance gates, site lighting and all associated site works.

To find out more details on this Office Development in Limerick take the free trial here.


Address:
Bridge Engineering

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL