24 Apr 2024
Demolition of the existing school building (s) known as Ardscoil Mhuire and the construction of 30 no. Dwelling units (2,3,4 & 5 beds), connection to existing storm drainage network on public road (R-257-12), collection of foul sewage to new on site pumping station and thereafter pumped to rear (East) of site into proposed new 350m long gravity foul sewer in a south east direction along public road (l-1383-1) connecting to existing foul sewer at industrial estate roundabout including all associated site works
To find out more details on this Residential Development in Donegal Started on 24th April 2024 take the free trial here.