24 Dec 2024
Construction of a 2-storey 2-unit residential maisonette block and 2 storey duplex dwelling known as BZ04 comprising 1 No. 2-bedroom unit at ground floor level & 1 No. 2-bedroom unit at first floor level and 1 no. 3 bedroom duplex at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of 187 no. 2 and 3 storey dwellings and all associated works.
18 Dec 2024
Construction of a 3-storey 4-unit residential duplex block known as BZ06 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin
17 Dec 2024
Construction of a 5-storey apartment block known as BA01 comprising of 25 No. Units at Mooretown Phase 2.01, Mooretown, Swords, Co. Dublin.
Construction of a 3-storey 4-unit residential duplex block known as BZ08 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of a 3-storey 4-unit residential duplex block known as BZ10 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of a 3-storey 4-unit residential duplex block known as BZ07 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of 2-storey 2-unit residential maisonette block and 2 storey duplex dwelling known as BZ05 comprising 1 No. 2-bedroom unit at ground floor level & 1 No. 2-bedroom unit at first floor level and 1 no. 3 bedroom duplex at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of a 2-storey 2-unit residential maisonette block and 2 storey duplex dwelling known as BZ09 comprising 1 No. 2-bedroom unit at ground floor level & 1 No. 2-bedroom unit at first floor level and 1 no. 3 bedroom duplex at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of a 5-storey apartment block known as BA02 comprising of 25 No. Units at Mooretown Phase 2.01, Mooretown, Swords, Co. Dublin.
Construction of a 3-storey 4-unit residential duplex block known as BZ02 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin.
Construction of a 3-storey 4-unit residential duplex block known as BZ03 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin
Construction of a 3-storey 4-unit residential duplex block known as BZ01 comprising 2 No. 1-bedroom units at ground floor level & 2 No. 2-bedroom units at first & second floor level at Mooretown Phase 2.01, Mooretown, Swords, Dublin
The proposed development will principally comprise the construction of:
A total of 274 no. residential units including 187 no. houses, and 87 no. duplex and apartment units, ranging from 2 – 5 storeys in height in a mixed tenure development (18 no. 1-beds, 109 no. 2-beds, 128 no. 3-beds and 19 no. 4-beds).
Landscaping works including the provision of Class 2 Open Space of c.18,065 sq.m including riparian corridors, 8 no. pocket parks with a total area of c.2,950 sq.m, and new pedestrian and cycle connections into neighbouring residential lands to the west and connecting tothe existing school access road along the western boundary.
A total of 415 no. car parking spaces consisting of 357 no. long-stay resident spaces, 58 no. short-stay and visitor spaces.
A total of 1,143 no. bicycle parking spaces consisting of 1,117 no. long-stay resident spaces and 26 no. short-stay visitor spaces.
Associated site and infrastructural works including the provision of foul and surface water drainage and associated connections, Sustainable Urban Drainage Systems including permeable paving, greens roofs, bio-retention planting and below ground tank storage.
6. The proposed development includes for all site enabling and development works, landscaping works, plant, PV panels, storage, boundary treatments, ESB substations, lighting, servicing, signage, and all site development works above and below ground.
To find out more details on this Residential Development in Dublin Started on 17th December 2024 take the free trial here.