16 Jan 2024
Erection of 3No terraces, two storey, timber frame, two and three bedroom dwellings and associated site works, including the continuation of Graydon Crescent forming a new entrance onto Burgage street and combination of on street and on Curtilage surface parking. Newcastle
–
Demolition of the existing dwelling (c. 235sq.m) and associated structures and the construction of a residential development of 39 dwellings comprising of (a) 15 two storey houses consisting of 14 three bedroom dwellings (House Types B1, B2, mid terraced B2s – end terrace) and 1 two storey four bedroom detached dwelling (House Type D4); (b) 24 duplex apartment/apartments in 2 three storey buildings – Block 1 located in the southern part of the site bounded by Burgage street to the east and Newcastle Boulevard to the south comprising 8 two bedroom apartments and 8 three bedroom 2 storey duplex apartments. Block 2 is located in the northern part of the site bounded by Burgage street to the east and the Main street to the north comprising 4 two bedroom apartments and 4 three bedroom 2 storey duplex apartments; (c) Open space, hard and soft landscaping (including public lighting & boundary treatment), communal open space for duplex apartments and apartments; along with single storey bicycle/bin stores and ESB substations; The proposal includes revisions to the permitted open space (under TA06S.305343 & ABP305343-19); (d) 3 Vehicular access points from Burgage Street (comprising car parking court to the south for Duplex building 1, car parking court to the north for Duplex building 2 and centrally access through the site which connects with the extension of Graydon Crescent) along with the provision of surface car parking (61 spaces), surface cycle spaces 74 spaces and 6 motorcycle spaces; (e) Provision of attenuation measures, connection to water supply, and provision of foul drainage infrastructure and all ancillary site development/construction/landscaping works; (f) 2 temporary (for 3 years) marketing signage structures, 1 located at the junction of Burgage Street and Main Street and 1 at the junction of Burgage street to the east and Newcastle Boulevard.
To find out more details on this Residential Development in Dublin Started on 16th January 2024 take the free trial here.