The site is generally bound: to the north by Adamstown Drive to the east by lands subject to a live Application for Tandy’s Lane Village Phase 3 Development (Reg. Ref. SDZ24A/0034W) and part of an access road (to form part of Tandy’s Avenue) which is currently under construction (permitted under Tandy’s Lane Village Phase 1 Development (Reg. Ref. SDZ19A/0011, as amended under Reg. Refs. SDZ21A/0008 & SDZ21A/0011) and also included within the Tandy’s Lane Village Phase 2 Development (Reg. Ref. SDZ22A/0006, as amended under Reg. Ref. SDZ23A/0006) and the live Application for Tandy’s Lane Village Phase 3 Development); to the south by part of an access road (to form part of Tandy’s Row) which is currently under construction (permitted under Tandy’s Lane Village Phase 2 Development); and to the west by part of an access road (to form part of Tandy’s Glen) which is currently under construction (permitted under Tandy’s Lane Village Phase 2 Development). This application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to Phase 4 of development within the Tandy’s Lane Village Development Area of the Adamstown Strategic Development Zone. The development also includes amendments to the permitted Phase 2 Development within the Tandy’s Lane Village Development Area (Reg. Ref. SDZ22A/0006, as amended under Reg. Ref. SDZ23A/0006). The proposed development will principally consist of the construction of 30 No. dwellings including 7 No. 2-bed units, 7 No. 3-bed units and 16 No. 4-bed units. The development will range in height between part 1 No. to 3 No. storeys. The development will also include: foul and surface water drainage connections amendments to the landscaping and footpaths permitted to the east, south and west of the site and to the car parking layout to the west of the site permitted in Tandy’s Lane Village Phase 2 Development 52 No. car parking spaces ESB substation hard and soft landscaping boundary treatments public lighting and all associated site and development works above and below ground.
To find out more details on this Residential Development in Dublin Granted permission on 24th October 2025 take the free trial here.

