12 April 2024
Demolition of existing dwelling and construction of 10 houses
Demolition of existing dwelling and construction of a four storey apartment building consisting of 14 apartments
25 Apr 2022 Demolition of existing 2 storey detached dwelling, site clearance and low level excavation works.
Permission for:
A. 10 no. houses (1 no. four-bedroom semi-detached, three storey over basement dwelling [House No. 1], 1 no. four-bedroom semi-detached, three storey over basement dwelling with associated balcony [24.6 sqm] to the rear [House no. 2], 3 no. three-bedroom, semi-detached, three-storey dwellings with balconies [between 10.9 sqm – 26.4 sqm] to the rear and roof lights [House no. 3, 4 & 5], 3 no. four-bedroom, semi-detached, three storey dwellings with balconies [between 12 sqm – 24.5 sqm] [House no. 6, 7& 8], 2 no. three-bedroom, semi-detached, two-storey dwellings [House no. 9 & 10]), each with private amenity space and 2 no. car parking spaces.
B. 1 no. four storey apartment building with setback third floor level and green roof, consisting of 14 no. apartments (1 no. one-bedroom apartment, 11 no. two-bedroom and 2 no. three-bedroom penthouse apartments) with associated private amenity space and balconies, including 14 no. car parking spaces, 20 no. bicycle parking spaces, 4 no. motor cycle parking spaces, refuse storage and communal open space areas. The development also includes:
C. Upgrade and widening of existing vehicular entrance on Castle Park Road, provision of internal roads, footpaths, shared surfaces within the proposed development and street lighting.
D. Provision of communal open space with hard/soft landscaping, play area, kickabout space and landscaping works to include tree planting and provision of low formal hedging and boundary treatments.
E. SuDS surface water drainage, foul drainage, green roof and water connections.
F. Demolition of existing two-storey dwelling, no. 39 Castle Park Road, entrance gates, piers, splay walls and all ancillary outbuildings on site.
G. All other site works necessary to facilitate the development.
To find out more details on this Residential Development in Dublin Started on 25th April 2022 take the free trial here.

