07 Feb 2024
Construction of a new two storey creche (shell and core only) and associated site works
Located North of Colaiste Ghlor na Mara and overlapping with Phase 2A & 2B off the Taylor Hill development (constructed / in construction), bounded generally by Taylor Hill Grange to the North, Taylor Hill Way to the South & Boulevard Road to the West and on a site to the East at Taylor Hill Wood (relating to works to enhance the existing detention basin). Planning Permission for development on 2 no. parcels of land (c.1.26 Ha.) relating to: ‘Phase 2D’ The proposal includes a portion of the site boundary of Planning Reg. Ref. F15A/0550 (amended by Planning Reg. Ref. F19A/0001) at Phase 2B of the Taylor Hill development (currently under construction).
The development will consist of alterations and extension of site boundaries to Planning Reg. Ref. F15A/0550 (amended by Planning Reg. Ref. F19A/0001) to provide for: The construction of 32 no. 2-storey dwellings, comprising 5 no. 2-bed (House Types E & L), 15 no. 3-bed (House Types D, K/K1 & F/F1/F2/F3) and 12 no. 3-bed dwellings with 4-bed option including dormer at 2nd floor level (House Types B & B1) with associated car parking and private open spaces; stone entrance wall and pier with capping to match existing on North side of Taylor Hill Grange; new access road linking Taylor Hill Grange with Taylor Hill Way; an enlarged (to comprise a 2-storey) crèche extending to c. 1,025 sw. m (345 sq. m permitted) with associated 5 no. car parking spaces and set down area; landscaping; associated infrastructure and site development works, including enhanced detention basin on a separate parcel of land to the East at Taylor Hill Wood.
The proposals comprise an additional phase to Planning Reg. Ref. F15A/0550, contributing to a total of 248 no. dwellings for Phase 2 A-D inclusive.
To find out more details on this Residential Development in Dublin Started on 14th September 2020 take the free trial here.