Development on site of approx 0.6 Ha. The development will consist of a) The demolition (approx 254 sqm.) of all single storey non-original extensions, a single-storey glass house and 3no. single storey outbuildings associated with an existing residential dwelling known as Saint Anne’s (A Protected Structure). b) the removal of all temporary timber sheds on site (approx 97sqm). c) the refurbishment and two storey extension of Saint Anne’s to provide for a newly renovated 2 storey 4 bedroom residential dwelling and c) the construction of a new residential development of 23no. units in 3no. new build Blocks A,B and C (all 3 stories in height). the refurbishment (approx 219sqm) and 2 storey extension (approx 106sqm) of St. Anne’s (A Protected Structure) will provide for a newly renovated 2 storey 4 bedroom residential dwelling (approx 325sqm) with associated car parking and private open space area. Refurbishment works will include the repair and partial replacement of hardwood floors, the application of external insulation to all original walls, the relocation of windows and doors to reflect original external reveals for new external insulation. the removal and extension of window jambs, the replacement of existing asphalt roof with a new insulated flat roof, the repair of water damaged ceilings and cornices, the removal of all later wall light fittings, surface cables, all non original furniture, cabinetry and fittings, the removal of later sanitary ware and replacement of same. The opening up of a blocked dining room fireplace to match original installation. The removal of existing ceramic tiles and the refurbishment of carpet flooring.
The new build development of 23no. residential units (9no. apartment units, 9no. duplex units and 5no. house units) will comprise: Block A (3 storeys) containing 2no. 2 bed apartment units at ground floor level and 2no. 3 bed duplex units over first and second floor levels and 1no. semi detached 3bed townhouse over ground, first
To find out more details on this Residential Development in Dublin Started on 23rd October 2024 take the free trial here.